Project Background

The Town of Blacksburg is in the planning stages for two projects to improve bicyclist and pedestrian safety and infrastructure on the North Main

North Main Street

Street and Patrick Henry Drive corridors. Both corridors are currently configured as four-lane roadways and experience safety challenges, speeding concerns, and limited accommodation for pedestrians and cyclists.

  • The North Main Street Corridor extends from the roundabout at Prices Fork Road to Red Maple Drive (approximately 1.4 miles).
  • The Patrick Henry Drive Corridor extends from the intersection at North Main Street to the intersection at Toms Creek Road and University City Boulevard (approximately 0.7 miles).

These two corridors were identified for bicyclist and pedestrian improvements through roadway reconfiguration in the 2020 North Main Street: Strategy for Redevelopment, the 2015 Bicycle Master Plan, and the 2022 Comprehensive Plan Transportation Project Priorities and Paths to the Future Map.

The Town has contracted with VHB (Vanasse Hangen Brustlin, Inc.), an engineering and planning firm, to evaluate converting both corridors to a three-lane configuration (one travel lane in each direction with a center two-way left-turn lane) and design short-term and long-term plans that incorporate dedicated bicycle and pedestrian facilities. The short-term plans would include pavement markings, signage, and other limited improvements. The long-term plans would consider wider sidewalks, landscaping, integrated transit stops, and other more involved improvements.

Interim design and public engagement are underway for the North Main Street Corridor. Design and engagement for the Patrick Henry Drive Corridor will follow in early 2027.

North Main Street Corridor

The Corridor has a history of fast vehicle speeds and a documented pattern of transportation safety issues:

  • Average speeds exceed the 35-mph posted speed limit
  • 86 road users were injured in a crash between 2021 and 2025

Roadway reconfiguration can reduce total crashes by up to 47%. (Source: Federal Highway Administration, FHWA)

The Town is proposing a mix of improvements to reconfigure the project area, which include:

  • Bike lanes with space between vehicles and cyclists
  • New center lane for vehicles to turn left for enhanced safety and reduced traffic delays
  • Additional crosswalks for pedestrians
  • Intersection improvements to enhance safety for all road users
  • Reduction in the speed limit from 35 mph to 30 mph
  • Conversion of McDonald Street to one-way (northbound) from the Progress Street signal to Montgomery Street

The proposed changes are expected to have the following impacts on traffic operations:

  • Average corridor travel time increases by up to 30 seconds
  • Approximately a 3 mph decrease in speed along the corridor
  • Improved signal phasing
  • Minimal increases in delay at the intersections during peak hours

Upcoming Public Engagement:

1. Open House Engagement Session: The Town invites the public to attend an in-person open house on Wednesday, December 2 from 5-7pm at the Blacksburg Community Center to learn more about these proposed changes and share input.

2. Survey: A public input survey will be available beginning on Thursday, December 3 and will close on Thursday, December 31 at 5pm. Project drawings will be available on the website following the public meeting.



Project Background

The Town of Blacksburg is in the planning stages for two projects to improve bicyclist and pedestrian safety and infrastructure on the North Main

North Main Street

Street and Patrick Henry Drive corridors. Both corridors are currently configured as four-lane roadways and experience safety challenges, speeding concerns, and limited accommodation for pedestrians and cyclists.

  • The North Main Street Corridor extends from the roundabout at Prices Fork Road to Red Maple Drive (approximately 1.4 miles).
  • The Patrick Henry Drive Corridor extends from the intersection at North Main Street to the intersection at Toms Creek Road and University City Boulevard (approximately 0.7 miles).

These two corridors were identified for bicyclist and pedestrian improvements through roadway reconfiguration in the 2020 North Main Street: Strategy for Redevelopment, the 2015 Bicycle Master Plan, and the 2022 Comprehensive Plan Transportation Project Priorities and Paths to the Future Map.

The Town has contracted with VHB (Vanasse Hangen Brustlin, Inc.), an engineering and planning firm, to evaluate converting both corridors to a three-lane configuration (one travel lane in each direction with a center two-way left-turn lane) and design short-term and long-term plans that incorporate dedicated bicycle and pedestrian facilities. The short-term plans would include pavement markings, signage, and other limited improvements. The long-term plans would consider wider sidewalks, landscaping, integrated transit stops, and other more involved improvements.

Interim design and public engagement are underway for the North Main Street Corridor. Design and engagement for the Patrick Henry Drive Corridor will follow in early 2027.

North Main Street Corridor

The Corridor has a history of fast vehicle speeds and a documented pattern of transportation safety issues:

  • Average speeds exceed the 35-mph posted speed limit
  • 86 road users were injured in a crash between 2021 and 2025

Roadway reconfiguration can reduce total crashes by up to 47%. (Source: Federal Highway Administration, FHWA)

The Town is proposing a mix of improvements to reconfigure the project area, which include:

  • Bike lanes with space between vehicles and cyclists
  • New center lane for vehicles to turn left for enhanced safety and reduced traffic delays
  • Additional crosswalks for pedestrians
  • Intersection improvements to enhance safety for all road users
  • Reduction in the speed limit from 35 mph to 30 mph
  • Conversion of McDonald Street to one-way (northbound) from the Progress Street signal to Montgomery Street

The proposed changes are expected to have the following impacts on traffic operations:

  • Average corridor travel time increases by up to 30 seconds
  • Approximately a 3 mph decrease in speed along the corridor
  • Improved signal phasing
  • Minimal increases in delay at the intersections during peak hours

Upcoming Public Engagement:

1. Open House Engagement Session: The Town invites the public to attend an in-person open house on Wednesday, December 2 from 5-7pm at the Blacksburg Community Center to learn more about these proposed changes and share input.

2. Survey: A public input survey will be available beginning on Thursday, December 3 and will close on Thursday, December 31 at 5pm. Project drawings will be available on the website following the public meeting.



Comments and Questions

Please let us know if you have any comments or questions about the project.